#71503: "A lot more automation in production phase through pre-planning"
O čom je toto hlásenie?
Čo sa stalo? Prosím vyber z nasledujúcich
Čo sa stalo? Prosím vyber z nasledujúcich
Prosím skontroluj, či už existuje hlásenie na rovnakú tému
Ak je to tak, prosím HLASUJTE za toto hlásenie. Hlásenia s najviac hlasmi majú PRIORITU!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Podrobný popis
-
• Prosím skopíruj a vlož chybové hlásenie, ktoré si videl na obrazovke, ak sa nejaké vyskytlo.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Prosím vysvetli, čo si chcel/a spraviť, čo si spravil/a a čo sa stalo
• Aký prehliadač používaš?
Google Chrome v102
-
• Skopíruj/vlož text zobrazený v angličtine namiesto tvojho jazyka. Ak máš snímku obrazovky s touto chybou (dobrý zvyk), môžeš použiť ľubovoľnú službu na zdieľanie obrázkov (napríklad snipboard.io), nahrať ho tam a odkaz sem skopírovať/vložiť. Je tento text dostupný v prekladovom systéme? Ak áno, bol preložený po dlhšie ako 24 hodín?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Aký prehliadač používaš?
Google Chrome v102
-
• Prosím presne a stručne vysvetli svoj podnet, aby bolo čo najjednoduchšie pochopiť, ako to myslíš.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Aký prehliadač používaš?
Google Chrome v102
-
• Čo sa objavilo na obrazovke, keď si bol zablokovaný (Prázdna obrazovka? Časť herného rozhrania? Chybové hlásenie?)?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Aký prehliadač používaš?
Google Chrome v102
-
• Ktorá časť pravidiel nebola dodržaná v BGA adaptácii?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Je možné vidieť porušenie pravidiel na zázname z hry? Ak áno, aké je číslo ťahu?
• Aký prehliadač používaš?
Google Chrome v102
-
• Aký herný ťah si chcel urobiť?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Čo si skúsil aby si vyvolal túto akciu?
-
• Čo sa stalo keď si spravil túto hernú akciu (chybové hlásenie, hlásenie v stavovom pruhu, ...)?
• Aký prehliadač používaš?
Google Chrome v102
-
• Kedy v priebehu hry sa problém vyskytol (aká bola prebiehajúca herná inštrukcia)?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Čo sa stalo keď si spravil túto hernú akciu (chybové hlásenie, hlásenie v stavovom pruhu, ...)?
• Aký prehliadač používaš?
Google Chrome v102
-
• Prosím popíš viditeľný problém. Ak máš snímku obrazovky s touto chybou (dobrý zvyk), môžeš použiť ľubovoľnú službu na zdieľanie obrázkov (napríklad snipboard.io), nahrať ho tam a odkaz sem skopírovať/vložiť.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Aký prehliadač používaš?
Google Chrome v102
-
• Skopíruj/vlož text zobrazený v angličtine namiesto tvojho jazyka. Ak máš snímku obrazovky s touto chybou (dobrý zvyk), môžeš použiť ľubovoľnú službu na zdieľanie obrázkov (napríklad snipboard.io), nahrať ho tam a odkaz sem skopírovať/vložiť. Je tento text dostupný v prekladovom systéme? Ak áno, bol preložený po dlhšie ako 24 hodín?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Aký prehliadač používaš?
Google Chrome v102
-
• Prosím presne a stručne vysvetli svoj podnet, aby bolo čo najjednoduchšie pochopiť, ako to myslíš.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Aký prehliadač používaš?
Google Chrome v102
História hlásenia
This could be auto-placement of produced cube if there is only one card that needs it.
Or we could set *one* card to auto-build in priority and cubes would automatically go to it.
Pridať niečo k tomuto hláseniu
- Iné ID stola / ID ťahu
- Vyriešil sa problém pomocou F5?
- Objavil sa problém viackrát? Zakaždým? Náhodne?
- Ak máš snímku obrazovky s touto chybou (dobrý zvyk), môžeš použiť ľubovoľnú službu na zdieľanie obrázkov (napríklad snipboard.io), nahrať ho tam a odkaz sem skopírovať/vložiť.